Click a smaller thumbnail to preview, or the larger image to view the full size image.
Building
Envelope Commissioning Provides
a systematic quality assurance process that is intended to identify and avoid
issues that could lead to defective or deficient building envelope assemblies
in new construction projects. Commissioning
of existing building envelope systems may require developing new functional
criteria to address the owner’s current requirements for system performance.
Building Envelope Commissioning provides documented confirmation that exterior
building systems function according to criteria set forth in the project
documents to satisfy the owner's operational needs. Commissioning of
existing building envelope systems may require developing new functional
criteria to address the owner's current requirements for system
performance.
WS Building Envelope provides professional services
through Pre-Design, Design, Construction, and Occupancy/Operations
phases to address any performance objectives required by an owner for
the exterior enclosure including the control of:
- Fire
- Acoustics
- Value
- Aesthetics
- Day lighting
- Heat flow (Infrared, Ultraviolet)
- Air flow (Infiltration, Exfiltration)
- Rain penetration, moisture control, vapor control
- Constructability, maintainability, and sustainability
- Structural performance, durability, security, & reliability.
Conformance to one or more requirements (project dependent):
- LEED for New Construction
- NIBS Guideline 3-2006
- Owners Project Requirements (OPR)
- California Title 24 (and other States requirements)
- ASHRAE
- GSA
- US Army Corps of Engineers
Work flow of available commissioning services - subject to the needs of the project and the client:
A/E Design Review > Trade Contractor Submittal Review > Field Observation
For further information regarding commissioning of the Building Envelope, please contact us or call (330) 860-0320